gyptazy.com is a Fediverse instance that uses the ActivityPub protocol. In other words, users at this host can communicate with people that use software like Mastodon, Pleroma, Friendica, etc. all around the world.

This server runs the snac software and there is no automatic sign-up process.

Site description
Only tech related content - nothing else!
Admin email
contact@gyptazy.com
Admin account
@gyptazy@gyptazy.com@gyptazy.com

Search results for tag #datacenter

[?]Benjamin Carr, Ph.D. 👨🏻‍💻🧬 » 🌐
@BenjaminHCCarr@hachyderm.io

’s consumed nearly as much as every home in the country combined in 2025 — server farms gulped 23% of national power despite years of grid restrictions
The report revealed that consumption rose to 7,663 GWh in 2025 a 10% rise in a single year. Meanwhile, consumption by the rest of the country increased by just 2% within the same period. Viewed over a ten-year period, the 2025 figure represents a steep 360% increase from 2015.
tomshardware.com/tech-industry

    [?]Benjamin Carr, Ph.D. 👨🏻‍💻🧬 » 🌐
    @BenjaminHCCarr@hachyderm.io

    servers will consume more power than all conventional hardware combined by 2027 — global data center consumption set to grow by 26% this year
    AI-optimized servers consumed about 95 TWh in 2025 and will draw 175 TWh in 2026, an increase of roughly 84%. Gartner expects that figure to reach 258 TWh in 2027, the point at which AI-optimized hardware will consume more electricity than conventional servers for the first time.
    tomshardware.com/tech-industry

      AodeRelay boosted

      [?]Wyatt Neal » 🌐
      @wyattearp@defcon.social

      THE DGX SPARK WAS NEVER SUPPOSED TO SET YOU FREE

      Listen to me.

      128GB WAS NOT A TECHNICAL LIMIT.

      It was a containment boundary.

      You think NVIDIA accidentally built a tiny Blackwell supercomputer with 200Gb networking and then somehow stumbled into exactly enough memory to make every ambitious local-AI workload tantalizingly miserable?

      COME ON.

      64GB would've been obviously useless.

      256GB would've been dangerous.

      Because at 256GB, normal people start getting ideas.

      Suddenly you're running giant quantized models comfortably. Fine-tuning gets breathing room. Long contexts stop being a hostage negotiation. You start running multiple models.

      Then somebody asks the forbidden question:

      "Why the hell am I renting GPUs?"

      AND THAT QUESTION CANNOT BE ALLOWED TO PROPAGATE.

      So they gave us 128GB.

      Not enough to escape.

      Enough to see the fence.

      And look at the networking!

      WHY DOES THE CUTE LITTLE DESKTOP AI BOX HAVE 200 GIGABIT CONNECTX?!

      Because the second you smash into the memory ceiling, NVIDIA already has the solution:

      BUY ANOTHER SPARK.

      Now you've got 256GB!

      Need more?

      BUY FOUR.

      Congratulations!

      You wanted a desktop computer and somehow NVIDIA convinced you to build a FUCKING CLUSTER.

      And if you're sitting there thinking:

      "Surely NVIDIA couldn't possibly put dramatically more coherent memory into a local workstation..."

      WRONG.

      DGX STATION: 748GB.

      THE MEMORY EXISTS.

      THE TECHNOLOGY EXISTS.

      THEY KNOW YOU WANT IT.

      THEY JUST PUT IT IN THE NEXT ROOM AND CHARGE ADMISSION.

      This isn't product segmentation.

      THIS IS COMPUTATIONAL EDGING.

      Spark lets you load the model.

      Lets you run the model.

      Lets you fine-tune just enough of the model.

      Lets you build an entire workflow around the model.

      And precisely when you've invested three weekends, fourteen containers, two broken CUDA environments and the remaining fragments of your marriage:

      OOM

      That's not an error message.

      THAT'S THE SALES DEPARTMENT KNOCKING.

      And NVIDIA TELLS YOU THE PLAN!

      Develop locally.

      Prototype locally.

      Validate locally.

      Then move the serious work onto larger NVIDIA infrastructure.

      MY BROTHER IN CUDA,

      THAT ISN'T A WORKFLOW.

      THAT IS A FUNNEL.

      Spark isn't supposed to replace the data center.

      Spark is the free sample outside the data center.

      The 128GB isn't there because NVIDIA couldn't give you 256.

      It's there because 256GB might have been enough.

      And enough is the most dangerous word in NVIDIA's entire business model.

      So remember:

      64GB = nobody buys it.

      128GB = everybody wants more.

      256GB = people start getting independent.

      748GB = PLEASE SEE YOUR NVIDIA SALES REPRESENTATIVE.

      WAKE UP.

      REMOVE THE THERMAL PASTE FROM YOUR THIRD EYE.

      ALIGN YOUR CUDA CHAKRAS.

      WRAP YOUR CONNECTX CABLES IN TIN FOIL.

      THE DGX SPARK ISN'T A PERSONAL AI SUPERCOMPUTER.

      IT'S A 128GB GATEWAY DRUG TO THE DATA CENTER.